水上樂園的設(shè)備的籌建,并非簡單從字面上理解的項目工程籌備施工建設(shè),而是把項目作為一個整體來統(tǒng)籌、運營管理的過程。所以水上樂園建設(shè)基本流程要了解到,如下:
The preparation and construction of the equipment of the water park is not simply the preparation and construction of the project, but the process of overall planning, operation and management of the project as a whole. Therefore, the basic construction process of the water park should be understood as follows:
一、概念設(shè)計規(guī)劃階段
1、 Conceptual design planning stage
1、選定概念設(shè)計單位,進行概念設(shè)計工作對接;
1. Select a conceptual design unit to conduct conceptual design docking;
2、創(chuàng)意主題、故事線主題形象設(shè)備清單各層平面布局圖、整體鳥瞰圖、設(shè)備外包風(fēng)格等。
2. Creative theme, story line theme image equipment list, layout plan of each floor, overall aerial view, equipment outsourcing style, etc.
二、水上游樂設(shè)施選型階段
2、 Type selection stage of water amusement facilities
1、根據(jù)概念設(shè)計提供的設(shè)備清單進行設(shè)備選型、采購,確定設(shè)備生產(chǎn)周期;
1. Select and purchase equipment according to the equipment list provided by the conceptual design, and determine the equipment production cycle;
2、確定設(shè)備位置、占地面積、基礎(chǔ)圖紙。
2. Determine the equipment location, floor area and foundation drawings.
三、水上樂園規(guī)劃設(shè)計階段
3、 Water park planning and design stage
方案設(shè)計:
Scheme design:
1、各分區(qū)平面圖、總平面圖、游客動線、交通路線、疏散路線室內(nèi)包裝設(shè)計;
1. Interior packaging design of each partition plan, general plan, tourist movement line, traffic route and evacuation route;
2、室內(nèi)景觀設(shè)計、室內(nèi)景觀道具樣式設(shè)計、協(xié)助工具道具設(shè)計;
2. Interior landscape design, interior landscape prop style design, and assist in tool prop design;
3、設(shè)備包裝設(shè)計;
3. Equipment packaging design;
4、照明系統(tǒng)設(shè)計。
4. Lighting system design.
擴初設(shè)計室內(nèi)包裝設(shè)計:
Expansion design indoor packaging design:
1、室內(nèi)景觀設(shè)計;
1. Interior landscape design;
2、環(huán)藝及場景道具;
2. Environmental art and scene props;
3、設(shè)備包裝設(shè)計;
3. Equipment packaging design;
4、照明系統(tǒng)設(shè)計。
4. Lighting system design.
四、土建施工建設(shè)階段
4、 Civil construction stage
按照水上樂園的規(guī)劃圖紙進行,尤其注意預(yù)埋件的位置、進出水口、承重結(jié)構(gòu)等
According to the planning drawings of the water park, pay special attention to the location of embedded parts, water inlet and outlet, load-bearing structure, etc


五、設(shè)備安裝調(diào)試
5、 Equipment installation and commissioning
1、質(zhì)監(jiān)部門登記備案;
1. Registration and filing with the quality supervision department;
2、設(shè)備安裝、設(shè)備安裝調(diào)試;
2. Equipment installation and commissioning;
3、游樂設(shè)備驗收取證;
3. Amusement equipment acceptance certificate;
4、設(shè)備維護、操作培訓(xùn)。
4. Equipment maintenance and operation training.
六、運營團隊招聘組建及培訓(xùn)
6、 Recruitment, establishment and training of operation team
1、運營管理制度、體系建立;
1. Establishment of operation management system;
2、設(shè)備安裝調(diào)試前招聘到位核心管理層和設(shè)備維修人員;
2. Recruit core management and equipment maintenance personnel in place before equipment installation and commissioning;
3、設(shè)備安裝調(diào)試后期,游樂設(shè)備操作人員到位;
3. At the later stage of equipment installation and commissioning, amusement equipment operators are in place;
4、服務(wù)禮儀、流程培訓(xùn)、安全管理培訓(xùn);
4. Service etiquette, process training and safety management training;
5、操作、維修、管理崗位人員考取相應(yīng)證件;
5. Personnel in operation, maintenance and management positions shall obtain corresponding certificates;
6、游樂設(shè)備基本知識培訓(xùn)、操作應(yīng)急演練培訓(xùn)、各崗位模擬實操培訓(xùn)。
6. Basic knowledge training of amusement equipment, operation emergency drill training and simulated practical operation training of each post.
七、試運營
7、 Trial operation
1、員工熟悉各自崗位工作流程、服務(wù)流程;
1. Employees are familiar with the work process and service process of their posts;
2、收集游客反饋意見,進行升級改造;
2. Collect tourists' feedback and upgrade;
3、在運營中發(fā)現(xiàn)不足,進行流程優(yōu)化等內(nèi)容;
3. Find deficiencies in operation and optimize the process;
4、安全隱患排查、整改。
4. Troubleshooting and rectification of potential safety hazards.
八、正式開業(yè)
8、 Official opening
1、前期宣傳;
1. Early publicity;
2、活動安排;
2. Activity arrangement;
3、客流安全控制;
3. Passenger flow safety control;
4、危機公關(guān)演練;
4. Crisis public relations drill;
5、安全應(yīng)急預(yù)案;
5. Safety emergency plan;
6、開業(yè)優(yōu)惠政策;
6. Preferential policies for business opening;
7、設(shè)備維護與更新。
7. Equipment maintenance and update.
以上就是今天為大家分享的關(guān)于問題的相關(guān)內(nèi)容,希望對大家能有所幫助,想要了解更多內(nèi)容可以電話聯(lián)系我們或者關(guān)注我們的網(wǎng)站http://www.979yy.cn。
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website http://www.979yy.cn 。
相關(guān)新聞
- 室內(nèi)兒童水上樂園設(shè)備應(yīng)該要滿足什么需求?2023-03-18
- 水上滑梯設(shè)備在制作設(shè)計過程中的事項2023-03-17
- 水上樂園設(shè)備設(shè)計的要點有哪些?2023-03-16
- 水上樂園的衛(wèi)生工作又該如何開展2023-03-15
- 解析購置水上新型游樂設(shè)備的好處2023-03-14
- 使用兒童戲水設(shè)施前一定要先檢查設(shè)備情況!2023-03-13
- 水上滑梯設(shè)備的安全下滑方式2023-03-11
- 怎樣的游樂設(shè)備適合作為景點配套設(shè)施2023-03-10