
服務(wù)熱線電話
400-840-8766
一個(gè)水上樂(lè)園的建造需要詳細(xì)的設(shè)計(jì)流程
來(lái)源:http://www.979yy.cn/ 日期:2022-07-02 發(fā)布人:admin 瀏覽量:次
水上樂(lè)園是近年來(lái)比較流行、容易吸金的主題旅游產(chǎn)品之一。 如果水上樂(lè)園一直處于不歸狀態(tài),直接關(guān)系到它的項(xiàng)目規(guī)劃和規(guī)劃。 如何更好更快地推進(jìn)項(xiàng)目建設(shè),實(shí)現(xiàn)落地運(yùn)營(yíng)? 水上樂(lè)園的建設(shè)需要一個(gè)詳細(xì)的設(shè)計(jì)過(guò)程。
Water park is one of the popular theme tourism products that are easy to attract gold in recent years. If the water park has been in a state of non return, it is directly related to its project planning and planning. How to better and faster promote the project construction and realize the landing operation? The construction of water park needs a detailed design process.
1、投資規(guī)劃:考察項(xiàng)目的市場(chǎng)、經(jīng)濟(jì)和同行競(jìng)爭(zhēng)情況,確定項(xiàng)目的市場(chǎng)定位,確定項(xiàng)目的合理投資金額和各功能模塊的投資比例。
1. Investment planning: investigate the market, economy and peer competition of the project, determine the market positioning of the project, determine the reasonable investment amount of the project and the investment proportion of each functional module.
2、品牌策劃:根據(jù)投資策劃思路,根據(jù)市場(chǎng) 定位和吸引力,確定項(xiàng)目品牌戰(zhàn)略和競(jìng)爭(zhēng)戰(zhàn)略。 從目標(biāo)消費(fèi)群體和項(xiàng)目未來(lái)營(yíng)銷的角度,進(jìn)行娛樂(lè)創(chuàng)意,規(guī)劃項(xiàng)目的亮點(diǎn)和賣點(diǎn),打造差異化。
2. Brand planning: determine the brand strategy and competitive strategy of the project according to the investment planning ideas and market positioning and attraction. From the perspective of target consumer groups and future marketing of the project, carry out entertainment creativity, plan the highlights and selling points of the project, and create differentiation.
3、設(shè)計(jì)策劃:按照投資策劃和品牌策劃的思路,過(guò)渡到設(shè)計(jì)實(shí)施,圍繞項(xiàng)目的特點(diǎn)和差異化,對(duì)設(shè)計(jì)內(nèi)容進(jìn)行全面的組織和深化。 確定建設(shè)內(nèi)容和功能劃分,選擇建筑風(fēng)格、文化主題、水上樂(lè)園設(shè)備并分析可行性,為后續(xù)設(shè)計(jì)提供控制技術(shù)指標(biāo)的要求或指導(dǎo)。
3. Design planning: according to the ideas of investment planning and brand planning, transition to design implementation, and comprehensively organize and deepen the design content around the characteristics and differentiation of the project. Determine the construction content and function division, select architectural style, cultural theme, water park equipment and analyze the feasibility, so as to provide requirements or guidance for subsequent design to control technical indicators.
4、總體規(guī)劃設(shè)計(jì):通過(guò)總體規(guī)劃設(shè)計(jì)圖表達(dá)項(xiàng)目的建設(shè)內(nèi)容和布局,確定項(xiàng)目各功能區(qū)的空間位置關(guān)系及其與外界的聯(lián)系,提出主要標(biāo)志性建筑 造型方案和重要節(jié)點(diǎn)景觀方案,指出設(shè)計(jì)要點(diǎn),合理布置水上樂(lè)園設(shè)備。
4. Overall planning and Design: express the construction content and layout of the project through the overall planning and design drawings, determine the spatial location relationship of each functional area of the project and its connection with the outside world, put forward the main landmark building modeling scheme and important node landscape scheme, point out the design points, and reasonably arrange the water park equipment.


5、初步設(shè)計(jì):根據(jù)總體設(shè)計(jì)圖深化分區(qū)的具體設(shè)計(jì),提煉娛樂(lè)創(chuàng)意和核心項(xiàng)目的重點(diǎn)內(nèi)容,確定技術(shù)方案和主要參數(shù)。
5. Preliminary design: deepen the specific design of the partition according to the overall design drawing, refine the entertainment creativity and the key contents of the core project, and determine the technical scheme and main parameters.
6、施工圖設(shè)計(jì):室內(nèi)水上樂(lè)園設(shè)備廠商認(rèn)為應(yīng)該編制詳細(xì)的總圖、分專業(yè)的詳細(xì)圖、施工概算,并表達(dá)每個(gè)細(xì)節(jié)的具體尺寸、材料、做法等技術(shù)要求。
6. Construction drawing design: the equipment manufacturer of the indoor water park believes that it is necessary to prepare detailed general drawings, detailed drawings by discipline, and construction estimates, and express the specific size, materials, practices and other technical requirements of each detail.
因此,水上樂(lè)園的籌建,并不是簡(jiǎn)單地從字面上理解項(xiàng)目的籌建和建設(shè),而是將項(xiàng)目作為一個(gè)整體進(jìn)行協(xié)調(diào)、運(yùn)營(yíng)和管理的過(guò)程。后續(xù)大家想了解更多相關(guān)知識(shí)內(nèi)容,可以持續(xù)關(guān)注我們的官網(wǎng)http://www.979yy.cn,有什么需要大家隨時(shí)聯(lián)系我們。
Therefore, the preparation of the water park is not simply to understand the preparation and construction of the project literally, but to coordinate, operate and manage the project as a whole. In the future, if you want to know more about relevant knowledge, you can continue to pay attention to our official website http://www.979yy.cn , please feel free to contact us if you need anything.
相關(guān)案例
相關(guān)新聞
- 室內(nèi)兒童水上樂(lè)園設(shè)備應(yīng)該要滿足什么需求?2023-03-18
- 水上滑梯設(shè)備在制作設(shè)計(jì)過(guò)程中的事項(xiàng)2023-03-17
- 水上樂(lè)園設(shè)備設(shè)計(jì)的要點(diǎn)有哪些?2023-03-16
- 水上樂(lè)園的衛(wèi)生工作又該如何開(kāi)展2023-03-15
- 解析購(gòu)置水上新型游樂(lè)設(shè)備的好處2023-03-14
- 使用兒童戲水設(shè)施前一定要先檢查設(shè)備情況!2023-03-13
- 水上滑梯設(shè)備的安全下滑方式2023-03-11
- 怎樣的游樂(lè)設(shè)備適合作為景點(diǎn)配套設(shè)施2023-03-10